| Water |
1 |
Water Quality - IEPA LT2 Standards Comp. |
Preventative |
$ 15,000 |
Reserves |
| |
|
These funds will cover the cost
of purchasing automatic hydrant flushing devices. The new regulatory
standards regulate disinfectant byproducts present in drinking water. A
standard monitoring plan is due to the IEPA by October 2007; the schedule is
to include increased montioring of DBP.
Current monitoring indicates that an increase in usage will be
necessary to continue to meet standards. |
|
|
|
| Water |
1 |
Pump Rehabilitation Program |
Preventative |
$ 25,000 |
Reserves |
| |
|
Reoccuring well meter and
backwash pump rehabilitation. Independent recommendation from Peerless Sevice
Co.5 year program. Maintaining the wells at the WTP reduces the
vulnerabiltity of the facility until an additional remote well and tower can
be added to the system. |
|
|
|
| Sanitary |
2 |
Sanitary sewer lining on Garfield Street, High Avenue, West Town line, and other locations idenitifed by CCTV
inspection tapes and cleaning programs.
Roots on Garfield and High lead to sanitary sewer back up issues. The West Town Line is to secure the sewer
from I/I and resume sanitary sewer billing. |
Preventative |
$ 150,000 |
1 |
| |
|
Sanitary sewer lining on
Garfield Street, High Avenue, West Town line, and other locations idenitifed
by CCTV inspection tapes and cleaning programs. Roots on Garfield and High lead to sanitary
sewer back up issues. The West Town
Line is to secure the line to resume sanitary sewer metering. This was an
item agreed upon at the February Commission meeting was of high importance. |
|
|
|
| Water |
2 |
Water Main Extension |
Major |
$ 75,000 |
2 |
| |
|
12inch main loop Armstrong to Rt
20 improve water quality, 8inch loop Meadows & Armstrong res. Complaint
water quality, 8inch loop Adam & Arcade to improve flow to the Jail, and
loop Laurel and Holly to tie City to Park Crest improve water quality. |
|
|
|
| Water |
2 |
Test Well |
Major |
$ 80,000 |
2 |
| |
|
Test well for a new source well
. Well required to improve dependability of the water supply for existing and
future growth. Vulnerability assessment of the WTP identified the necessity
for additional water sources. In addition, further inspection and testing of
the clearwell of the WTP cannot be completed until supply can be supplemented
from another source due to the sampling procedures required to bring the
clearwell back online. |
|
|
|
| Water |
2 |
Well 8 Rehabilitation |
Major |
$ 85,000 |
3 |
| |
|
Well 8 Radium investigation and
packer testing. Lining the well may be
necessary pending the investigation. Currently Freeport is below the radium
limits, however, radium is at detectable levels in the well and should be
tested and lined if necessary. |
|
|
|
| Water |
2 |
Well Rehabilitation |
Preventative |
$ 25,000 |
3 |
| |
|
Emergency cost of the wells at
the WTP. Refer to Peerless Service Report. 5 year program in tandem with the
pump program. This is possibly a capital program that should be assessed an
operational expense as the improvement may or may not be required within a
fiscal year. |
|
|
|
| Water |
2,3 |
Water Meters |
Replacement |
$ 30,000 |
3 |
| |
|
Meter replacement program,
scheduled replacement of 3000 meters over 3years. This has become an
increased priority as insurance costs escalate. The latest insurance claim was over $18K
for damage due to a plastic meter. A replacement program for 1,200 per year
would require $60K. |
|
|
|
| Sanitary |
2,3 |
Water Meters |
Replacement |
$ 30,000 |
4 |
| |
|
Meter replacement program,
scheduled replacement of 3000 meters over 3years. This has become an
increased priority as insurance costs escalate. The latest insurance claim was over $18K
for damage due to a plastic meter. A replacement program for 1,200 per year
would require $60K. |
|
|
|
| Water |
4 |
Valve Replacement Program |
Preventative |
$ 20,000 |
4 |
| |
|
Replacement of 12 to 20 valves,
these are valves that have been broken during operation. Work to be conducted
as a program by Commission staff. This program could be funded through
maintenance expenses, however, the number of valves would be dependent on the
maintenance funds available. By
separation in CIP expenditures, the program guarantees funding specifically
for valve replacement. Due to an aging
system this becomes more imminent with increased numbers of main breaks.
Valves can be reused when older mains are replaced. |
|
|
|
| Water |
4 |
Facility Upgrade |
Preventative |
$ 30,000 |
4 |
| |
|
Emergency maintenance costs and
building repairs, building brick and façade in need of repair, use new system
design life approx. 50 years. Again, these are funds to cover emergency
issues to ensure continued service to the residents. This is possibly a capital program that
should be assessed an operational expense as the improvement may or may not
be required within the fiscal year. |
|
|
|
| Water |
4 |
Water Storage Tank Inspection/ Cleaning |
Preventative |
$ 25,000 |
4 |
| |
|
Carroll Tank and Burchard Tank
exterior cleaning and inspection. This allows for defects in either of the
storage units to be addressed in a timely manner thereby reducing the need
for the storage units to be out of service. |
|
|
|
| Sanitary |
4 |
WWTP Facility Upgrades |
Preventative |
$ 30,000 |
4 |
| |
|
Membrane diffuser replacement,
originally installed 2000 with 5yr des. Life; Methane gas detection system,
Heating system upgrade. |
|
|
|
| Water |
4 |
Heavy Equipment Purchase |
Replacement |
$ 6,000 |
4 |
| |
|
Hydraulic pipe cutter for diameters 4 - 10 inch. |
|
|
|
| Water |
4 |
Vehicle Replacement |
Replacement |
$ 40,000 |
4 |
| |
|
Replace
vehicle No. 25, the vehicle will at that time have out lasted its value for
dependability complete with snow plow and salt spreader. The truck is from
1993. Corrective maintenance work orders for the year are 6 and a value of
$2K, further costs are anticipated to ensure the vehicle passes the IDOT
safety lane procedure. |
|
|
|
|
|
Total Estimated Value of Capital Improvments Approved by FWSC |
|
$666,000.00 |
|
| Of
Which $40,000 of projects will be funded by Reserves the remaining to be
funded by Surcharge is: |
|
$626,000.00 |
|
|
|
|
|
|
|
|
|